FUSION ASSETS, MOTHERWELL

INDUSTRIAL UNIT WITH OFFICE SPACE

Stein installed the Mechanical and Electrical services on high-quality Industrial Units in Newhouse, Motherwell. The previous proprietor developed the shell installations before the occupation of the units, and the highest value aspect of the installation of the services was the provision of efficient overhead, gas-fired radiant heaters.

The works were a fast-track fit, with the project successfully handed over on schedule and within budget.

SECTOR: COMMERCIAL
CLIENT/S: LUDDON CONSTRUCTION
LOCATION: GLASGOW
COMPLETION: SEPT 2021

  • M&E fit out of the office facilities including IT Infrastructure.

  • Workshop Ventilation Systems

  • An integrated Fire and Security System

  • Carpark/Street Lighting

  • Air Conditioning System

  • Plant Test & Commission

  • Heating System and Ventilation System

RELATED CASE STUDIES

Air Conditioning Installation on ceiling inside empty office/ room includes metal pipes on ceiling.

Belgrave Logistics Park, Glasgow

NEW OFFICE

EMPTY NEW INDUSTRIAL WAREHOUSE SHOWCASING LIGHT INALLATION DESIGN

Belgrave Logistics Park, Glasgow

NEW WAREHOUSE

Please get in touch if you require further information on our case studies or services.

stein accreditation icons